The DARHT II accelerator at LANL is preparing a series of preliminary tests at the reduced voltage of 7.8 MeV. The transport hardware between the end of the accelerator and the final target magnet was shipped to LLNL and installed on ETA II. Using the ETA II beam at 5.2 MeV we completed a set of experiments designed reduce start up time on the DARHT II experiments and run the equipment in a configuration adapted to the reduced energy. Results of the beam transport using a reduced energy beam, including the kicker and kicker pulser system will be presented.

Original languageEnglish (US)
Title of host publicationDigest of Technical Papers-IEEE International Pulsed Power Conference
Pages136-138
Number of pages3
DOIs
StatePublished - 2007
Externally publishedYes
Event2005 IEEE Pulsed Power Conference, PPC - Monterey, CA, United States
Duration: Jun 13 2005Jun 17 2005

Other

Other2005 IEEE Pulsed Power Conference, PPC
CountryUnited States
CityMonterey, CA
Period6/13/056/17/05

Fingerprint

Particle accelerators
Magnets
Experiments
Hardware
Electric potential

ASJC Scopus subject areas

  • Electrical and Electronic Engineering

Cite this

Weir, J. T., Anaya, E. M., Caporaso, G. J., Chambers, F. W., Chen, Y. J., Falabella, S., ... Hughes, T. P. (2007). DARHT II scaled accelerator tests on the ETA II accelerator. In Digest of Technical Papers-IEEE International Pulsed Power Conference (pp. 136-138). [4084170] https://doi.org/10.1109/PPC.2005.300525

DARHT II scaled accelerator tests on the ETA II accelerator. / Weir, John T.; Anaya, Enrique M.; Caporaso, George J; Chambers, Frank W.; Chen, Yu Jiuan; Falabella, Steven; Lee, Bryan S.; Paul, Arthur C.; Raymond, Brett A.; Richardson, Roger A.; Watson, James A.; Chan, Dominic; Davis, Harold A.; Day, Lisa A.; Scarpetti, Raymond D.; Schultze, Martin E.; Hughes, Thomas P.

Digest of Technical Papers-IEEE International Pulsed Power Conference. 2007. p. 136-138 4084170.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Weir, JT, Anaya, EM, Caporaso, GJ, Chambers, FW, Chen, YJ, Falabella, S, Lee, BS, Paul, AC, Raymond, BA, Richardson, RA, Watson, JA, Chan, D, Davis, HA, Day, LA, Scarpetti, RD, Schultze, ME & Hughes, TP 2007, DARHT II scaled accelerator tests on the ETA II accelerator. in Digest of Technical Papers-IEEE International Pulsed Power Conference., 4084170, pp. 136-138, 2005 IEEE Pulsed Power Conference, PPC, Monterey, CA, United States, 6/13/05. https://doi.org/10.1109/PPC.2005.300525
Weir JT, Anaya EM, Caporaso GJ, Chambers FW, Chen YJ, Falabella S et al. DARHT II scaled accelerator tests on the ETA II accelerator. In Digest of Technical Papers-IEEE International Pulsed Power Conference. 2007. p. 136-138. 4084170 https://doi.org/10.1109/PPC.2005.300525
Weir, John T. ; Anaya, Enrique M. ; Caporaso, George J ; Chambers, Frank W. ; Chen, Yu Jiuan ; Falabella, Steven ; Lee, Bryan S. ; Paul, Arthur C. ; Raymond, Brett A. ; Richardson, Roger A. ; Watson, James A. ; Chan, Dominic ; Davis, Harold A. ; Day, Lisa A. ; Scarpetti, Raymond D. ; Schultze, Martin E. ; Hughes, Thomas P. / DARHT II scaled accelerator tests on the ETA II accelerator. Digest of Technical Papers-IEEE International Pulsed Power Conference. 2007. pp. 136-138
@inproceedings{bf204a91842249bf9804e369b656b3ae,
title = "DARHT II scaled accelerator tests on the ETA II accelerator",
abstract = "The DARHT II accelerator at LANL is preparing a series of preliminary tests at the reduced voltage of 7.8 MeV. The transport hardware between the end of the accelerator and the final target magnet was shipped to LLNL and installed on ETA II. Using the ETA II beam at 5.2 MeV we completed a set of experiments designed reduce start up time on the DARHT II experiments and run the equipment in a configuration adapted to the reduced energy. Results of the beam transport using a reduced energy beam, including the kicker and kicker pulser system will be presented.",
author = "Weir, {John T.} and Anaya, {Enrique M.} and Caporaso, {George J} and Chambers, {Frank W.} and Chen, {Yu Jiuan} and Steven Falabella and Lee, {Bryan S.} and Paul, {Arthur C.} and Raymond, {Brett A.} and Richardson, {Roger A.} and Watson, {James A.} and Dominic Chan and Davis, {Harold A.} and Day, {Lisa A.} and Scarpetti, {Raymond D.} and Schultze, {Martin E.} and Hughes, {Thomas P.}",
year = "2007",
doi = "10.1109/PPC.2005.300525",
language = "English (US)",
isbn = "078039190X",
pages = "136--138",
booktitle = "Digest of Technical Papers-IEEE International Pulsed Power Conference",

}

TY - GEN

T1 - DARHT II scaled accelerator tests on the ETA II accelerator

AU - Weir, John T.

AU - Anaya, Enrique M.

AU - Caporaso, George J

AU - Chambers, Frank W.

AU - Chen, Yu Jiuan

AU - Falabella, Steven

AU - Lee, Bryan S.

AU - Paul, Arthur C.

AU - Raymond, Brett A.

AU - Richardson, Roger A.

AU - Watson, James A.

AU - Chan, Dominic

AU - Davis, Harold A.

AU - Day, Lisa A.

AU - Scarpetti, Raymond D.

AU - Schultze, Martin E.

AU - Hughes, Thomas P.

PY - 2007

Y1 - 2007

N2 - The DARHT II accelerator at LANL is preparing a series of preliminary tests at the reduced voltage of 7.8 MeV. The transport hardware between the end of the accelerator and the final target magnet was shipped to LLNL and installed on ETA II. Using the ETA II beam at 5.2 MeV we completed a set of experiments designed reduce start up time on the DARHT II experiments and run the equipment in a configuration adapted to the reduced energy. Results of the beam transport using a reduced energy beam, including the kicker and kicker pulser system will be presented.

AB - The DARHT II accelerator at LANL is preparing a series of preliminary tests at the reduced voltage of 7.8 MeV. The transport hardware between the end of the accelerator and the final target magnet was shipped to LLNL and installed on ETA II. Using the ETA II beam at 5.2 MeV we completed a set of experiments designed reduce start up time on the DARHT II experiments and run the equipment in a configuration adapted to the reduced energy. Results of the beam transport using a reduced energy beam, including the kicker and kicker pulser system will be presented.

UR - http://www.scopus.com/inward/record.url?scp=45149102518&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=45149102518&partnerID=8YFLogxK

U2 - 10.1109/PPC.2005.300525

DO - 10.1109/PPC.2005.300525

M3 - Conference contribution

SN - 078039190X

SN - 9780780391901

SP - 136

EP - 138

BT - Digest of Technical Papers-IEEE International Pulsed Power Conference

ER -